Foundations, frame and slabs sized to the ground you actually have, with calculations signed and stamped.
| Typical programme | 3 to 8 weeks |
|---|---|
| Deliverable | Drawings + signed calculations |
| Codes | BS / Eurocode as the county requires |
| Site inspections | One per structural pour |
Programmes are typical, not promises. Yours is fixed in writing once we have seen the plot and the brief.
You approve and pay stage by stage. Stop at any gate and you keep everything issued up to it.
Geotechnical review, load take-down and a decision on the foundation type, before anything is sized.
Columns, beams and slabs designed to the loads and the ground. Sized once, properly, not padded.
Reinforcement drawings and bar bending schedules the steel fixer can work from without guessing.
Calculations signed and stamped for submission, then inspection at each pour through the build.
The frame was sized to the ground, not to a rule of thumb. We saved on steel and slept fine.
No brochure, no callback queue. The form opens WhatsApp with your details filled in, and the reply comes from the head architect's own line within 24 hours.